The sophisticated single-story, custom built in 2018 and reimagined since then, sits on a half-acre lot in one of Summerlin’s most desirable and sought-after neighborhoods.
The sophisticated single-story, custom built in 2018 and reimagined since then, sits on a half-acre lot in one of Summerlin’s most desirable and sought-after neighborhoods.